Allt Mor Hydro LLP
Lanark, EnglandTriodos Bank UK | |
Sector | Sustainable Energy |
Allt Mor Hydro is based on the Dunalistair Estate, in Perthshire. This scheme became operational in 2015, with an initial installed capacity of 330kW, before being upgraded to 350kW in 2016. The turbine is designed to be compact with high operational efficiency. This loan re-finances existing lending that was used to build this hydropower project.